Buildings consume one-third of all energy and two-thirds of all electricity generated. Cool metal roofs can help reduce energy consumption by lowering cooling costs with their wide array of finishes, designs and colors. We manufacture 3 panel profiles in a variety of gauges to match the look and style you want. The exterior of a metal building is essentially maintenance free and long-lasting, thanks to superior, life-extending wall and roof coatings that retain color and resist dirt. Metal walls and sloped metal roofing are both self-cleaning.
Services
All Steel Buildings & Components, Inc. is a local, family owned and operated business established in 1984. We have over 150 years combined experience and a dedicated team of professionals committed to providing customers premium products at a competitive price. We are FBC (Florida Building Commission) approved and carry an A+ rating with the Better Business Bureau. We provide our services to the south eastern United States and The Caribbean Islands. All of our manufactured panels are Florida Product Approved.
We have highly trained and experienced steel building erection crews who will get the job finished on time and within budget. Done right, The first time. Our engineers with specialized expertise can envision and design components and expansions that are not possible with traditional building materials and methods.
We also carry a vast array of steel building components with includes but not limited to: Sealants, Fasteners, Closures, Bolts, Boots, Vents, Insulation, Hat channel, Skylights, Clips, Angle, Standard and Custom Trim and much more. We hired All Steel to unload and manage our prefab metal building being shipped, unloaded and stored at our company's lot.
Reviews (9)
Janet Hood
May 23, 2022
Scott Smith
Jul 18, 2021
Scott Smith
Feb 02, 2021
I had All Steel replace a steel roof on my 28,000 sq. ft. warehouse and I was really pleased with the job they did. A couple of minor snafus occurred but that's to be expected on a job of this size. The important thing was Bobby Ramey, the owner, had his crew fix the problems immediately and without argument. He made sure everything was buttoned up and looking great before they signed off.
Ed Olson
Dec 11, 2020
July 2019 I talked to John about having a 18x23 garage building built for me on my property. I left a deposit to get things prepared for the permit. It took the county a couple of months to get the permit. In October 2019 the pad was poured by Ty. I was then told by John that the building was scheduled to be installed the week of Nov 18 and he said it would take 3 days.
On Tuesday Nov 19 I contacted John to see when the guys would be out. He said not until Monday after Thanksgiving. I was okay with that, but not happy. No show or call on Monday or Tuesday. so I called John on Wednesday. he said the guys are behind schedule and will be out Dec 2. Well that didn't happen. Finally on Friday Dec 13th the crew showed up.
Material was dropped off on the pad. During the install, they noticed the pad was out of square and had to stop construction. John called me and explained the problem and it was going to be corrected. Also said they would be back out to put the building up next week, which is this week. So far, Ty (the concrete contractor) came out Friday 13th, looked at the problem and has done nothing.
At this point I am extremely disappointed with this whole process. Not sure what to do next. Hopefully the owner will contact me with a solution. Update 12/20/19 John called yesterday and said that Ty was going to correct the out of square slab, by putting a cap on it and correcting the slab that is 6 inches out of square. As of today a week after All Steel noticed the problem. NOTHING HAS BEEN DONE! Update: The owner Bobby, personally got involved with all my concerns and made things happen. All in all I am very satisfied with my building.
On Tuesday Nov 19 I contacted John to see when the guys would be out. He said not until Monday after Thanksgiving. I was okay with that, but not happy. No show or call on Monday or Tuesday. so I called John on Wednesday. he said the guys are behind schedule and will be out Dec 2. Well that didn't happen. Finally on Friday Dec 13th the crew showed up.
Material was dropped off on the pad. During the install, they noticed the pad was out of square and had to stop construction. John called me and explained the problem and it was going to be corrected. Also said they would be back out to put the building up next week, which is this week. So far, Ty (the concrete contractor) came out Friday 13th, looked at the problem and has done nothing.
At this point I am extremely disappointed with this whole process. Not sure what to do next. Hopefully the owner will contact me with a solution. Update 12/20/19 John called yesterday and said that Ty was going to correct the out of square slab, by putting a cap on it and correcting the slab that is 6 inches out of square. As of today a week after All Steel noticed the problem. NOTHING HAS BEEN DONE! Update: The owner Bobby, personally got involved with all my concerns and made things happen. All in all I am very satisfied with my building.
Joy Robertson
Dec 05, 2020
Tiffany Conner
Apr 14, 2020
Full transparency: I am not a customer. Wednesday before Thanksgiving we were in a traffic accident in front of this business. Before I even knew exactly what was happening several workers were already out and checking on all of us involved. They were nice, caring, and continued to check on us through the process. If we're ever in the market for their products, we will certainly be going here because it's obvious that they care about people!
Brian W.
Dec 31, 2019
All Steel Buildings installed a 30' x 80' work shop/garage for us. They did the building turn key from permitting, fill, concrete to final build out. TY, their concrete installer was awesome. I asked for a smooth finish inside the building and that is exactly what he did. The building installation crew were very helpful, easy to work with and fast. Eugene did a partial interior build out for 330 square feet of suspended shelving and did a great job. Margaret has been very helpful with the accounting side of the process and always willing to help answering questions or reach the person that can.
We had a few bumps in the road during construction process. Never had to worry because Bobby "Owner of All Steel Buildings" told me when I first met him, that he is a man of word and I will be happy with the final product. He is 110% correct. The final product is fantastic and look forward recommending All Steel Buildings to Family, Friends and if Bobby wants to add me to their referral list, I would welcome it. Thanks again for the awesome job.
We had a few bumps in the road during construction process. Never had to worry because Bobby "Owner of All Steel Buildings" told me when I first met him, that he is a man of word and I will be happy with the final product. He is 110% correct. The final product is fantastic and look forward recommending All Steel Buildings to Family, Friends and if Bobby wants to add me to their referral list, I would welcome it. Thanks again for the awesome job.
Fish Tales
Dec 15, 2018
Tim Gross
Mar 15, 2014